Loading…

Work on the Greece-Cyprus electricity interconnection is expected to resume within two months – and, in any case, before the end of the year – with the timetable agreed at the highest political level.
To respect copyright, we link to the source rather than republishing the full text. Read the complete article on ekathimerini.com.